问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirem...
查看答案
问题:单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()A PowerVMB VMControlC Active Memory SharingD Active Memory Expansion...
问题:单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740...
问题:单选题On a POWER7 processor based server what is the minimum number of cores used by the Hypervisor to run four threads?()A 1B 2C 4D 8...
问题:单选题A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()A PowerVM offers partition mobility.B PowerVM can virtualize network and SAN resources.C PowerVM suppo...
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer'...
问题:单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBM iC LinuxD VIO Server...
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents ...
问题:单选题A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools. What is the minimum PowerVM Ed...
问题:单选题A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2...
问题:单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition in...
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl St...
问题:单选题A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()A 8 desired proce...
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 fi...
问题:A customer requires two 12X loops on their new POWER7 system...
问题:单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and ...
问题:单选题What is the correct stage in the sales process for a Pre-Sales Technical Delivery Assessment (TDA)? ()A Before the first solution design meeting with the customerB After the solution design proposal is submitted to manufacturing for reviewC Once the c...
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable...
问题:单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address th...
问题:单选题A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()A L3 onlyB L1 and L2C L2 and L3D L1,L2 and L3...